Currently Showing 1-25 of 25 Contracts
Bid OpeningAgencyNameNumberTypeWork TypesLocation
6/15/2026, 7:00 AM
Lake of the Woods County, MN
Anthony Pirkl
2026-6
Buildings
Concrete
No Location Available
6/16/2026, 3:00 PM
Cass County, MN
CSAH 1 Bridge Replacement
60119
6/16/2026, 3:00 PM
Scott County, MN
2026 Building Demos
2026 Building Demos
No Location Available
6/17/2026, 2:00 PM
Goodhue County, MN
2026 Cannon Valley Trail Reconstruction
CVT26
Parks and Recreation
Trail Construction
6/17/2026, 2:00 PM
Crow Wing County, MN
2026 County Parking Lot Resurfacing
26021
Road and Street
Bituminous, Concrete, Electrical
6/17/2026, 2:30 PM
Goodhue County, MN
2026 Kullman Encroachment Project
30126
Drainage
Excavation
6/18/2026, 3:00 PM
St. Louis County, MN
CP 0305-556182 (Low); CP 0368-556185 (Tied); CP 0715-556187 (Tied); CP 8201-556189 (Tied); CP 8214-556191 (Tied)
CP 0305-556182
Road and Street
Bituminous
6/18/2026, 4:00 PM
City of Rochester, MN
Reconstruction of 100, 200, and 300 blocks of 5 Ave NW and 400 block of 3 ST NW
8915
6/23/2026, 3:00 PM
Carver County, MN
Bridge Nos. R0630 and R0631
CP-24-6905
Bridges
Bridge, Aggregate, Excavation, Pipe and Culvert
6/23/2026, 3:00 PM
Redwood County, MN
Waterbury Twp. Remove Bridge-Construct Roadway
26-4
Bridges
Aggregate, Bridge, Reconstruct, Surfacing
6/23/2026, 4:00 PM
City of Rochester, MN
J4739 2026 Pedestrian Ramps in Various Locations
J4739
6/23/2026, 7:00 PM
Hennepin County, MN
CSAH 61 (Hemlock Ln) and CSAH 130 (Elm Creek Blvd) Intersection Improvement
2220500
Road and Street
Reconstruct, Electrical, Grading, Bituminous, Concrete, Traffic Control, Traffic Marking/Striping, Trail Construction, Water Main/Storm Sewer/Sanitary Sewer
6/25/2026, 3:00 PM
St. Louis County, MN
CP 0000-884255 (Quote)
CP 0000-884255
Road and Street
Aggregate
6/25/2026, 3:00 PM
Waseca County, MN
CR 73 Culvert Replacement
812608
Road and Street
Pipe and Culvert
6/25/2026, 3:00 PM
Rice County, MN
ELECTRIC LIGHTING SYSTEMS
2676
No Location Available
6/26/2026, 3:00 PM
Polk County, MN
Fosston Fit Trail - Calvary Segment
SP 060-090-005
Road and Street
Trail Construction
6/26/2026, 4:00 PM
City of Bloomington, MN
Normandale Boulevard PMP Trail & Sidewalk Improvement
2024-110
Road and Street
Aggregate, Bituminous, Concrete, Clearing and Grubbing, Excavation, Grading, Mill and Overlay, Trail Construction, Water Main/Storm Sewer/Sanitary Sewer, Traffic Control, Traffic Marking/Striping, Pipe and Culvert
6/29/2026, 7:00 PM
Wright County, MN
TH 24 & CSAH 7 Reconstruction Clearwater
2609
No Location Available
6/30/2026, 6:00 PM
Carlton County, MN
Mission Creek Bridge Replacement
661037
Bridges
Bridge
7/1/2026, 3:00 PM
Pine County, MN
Bituminous Milling and Reclamation
2602
No Location Available
7/1/2026, 6:00 PM
Sherburne County, MN
2026 CSAH 4 & CR 46 Roundabout
23002
Road and Street
Aggregate, Bituminous, Excavation, Structural, Traffic Control, Traffic Marking/Striping
7/8/2026, 6:00 PM
Mower County, MN
SAP 050-605-018
22342
Bridges
Bridge
No Location Available
7/8/2026, 7:00 PM
City of Duluth, MN
2095 Aerial Lift Bridge Rehabilitation Project
2095 Aerial Lift Bri
Bridges
Bridge
7/9/2026, 3:00 PM
St. Louis County, MN
CP 0091-442363, SP 069-691-034, STBG-TA 6926-(238) (Low); CP 0091-930425 (Tied)
CP 0091-442363
Road and Street
Grading, Bituminous, Concrete
8/4/2026, 4:00 PM
City of Rochester, MN
J7829 Upgrade Replace Zumbro River Siphon at Silver Lake; Serving East Zumbro Sewer District
J7829