Contract Number:
26-10B
Projects:
26-10B
Other Projects:
Contract Description:
2026 Stormwater Improvements
Construction Location:
1- Randy Avenue, 2 - Milton Street, both in Shoreview, in Ramsey County, Minnesota.
City or Township:
Shoreview
Bid Opening Date & Time:
2/9/2027, 8:00 PM
Award Date:
3/1/2027
Contract Start Date:
3/1/2027
Construction Start Date:
4/12/2027
Construction End Date:
10/31/2027
Work Type:
Aggregate, Bituminous, Concrete, Reconstruct, Water Main/Storm Sewer/Sanitary Sewer
Project Type:
Road and Street
Highest Funding Level:
Local
DBE:
No
Project to remove sections of asphalt street and curb, replace watermain and reconstruction with pervious pavers, draintile and curb and gutter.
| Number | Description | Unit | Quantity |
|---|---|---|---|
2104.504/00120 | REMOVE BITUMINOUS PAVEMENT (ROAD) | SY | 1060 |
2106.507/00010 | EXCAVATION - COMMON | C Y | 772 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA230C) 1.5" THICK | TON | 49 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA230C) 2.0" THICK | TON | 64 |
2504.603 | 6" PVC WATERMAIN (C-900) | L F | 200 |
2531.503/02315 | CONCRETE CURB & GUTTER DESIGN B618 | L F | 754 |
2563.601/00010 | TRAFFIC CONTROL | LS | 1 |
2575.604 | SODDING TYPE LAWN W/6" TOPSOIL | SY | 465 |
2650.500 | 1-1/2" CLEAN ANGULAR ROCK (ASTM #2) | CY | 318 |
2650.518 | PERMEABLE ARTICULATING CONCRETE BLOCK | SF | 5092 |
Contract Owner
Contract Engineer