Contract Number:
LOST 9954-105
Projects:
LOST 9954-105
Other Projects:
Contract Description:
Bridge replacement with culvert, approach grading, aggregate base & aggregate surfacing
Construction Location:
County Rd 105, 0.8 miles south of the Jct of TH 30 and CR 105
City or Township:
Arendahl Twp

Bid Opening Date & Time:
11/9/2026, 3:00 PM
Award Date:
11/10/2026
Contract Start Date:
4/12/2027
Construction Start Date:
4/12/2027
Construction End Date:
4/30/2027
Work Type:
Pipe and Culvert
Project Type:
Road and Street
Highest Funding Level:
Local
DBE:
No
LOST 9954-105: Bridge 9954 replacement with culvert 23J81, approach grading, aggregate base & aggregate surfacing, located on County Rd 105, 0.8 miles south of the Jct of TH 30 and CR 105. Plan and proposal set price is $25.00 picked up, and $30.00 if sent by US mail
Major Items
NumberDescriptionUnitQuantity
2106.507
Common Embankment (CV)(P)
CY
321
2118.509
Aggregate Surfacing Cl 2
Ton
266
2211.509
Aggregate Base Cl 2A Mod
Ton
409
2401.507
Structural Concrete 3S52 (P)
CY
18
2401.508
Reinforcement Bars (Epoxy Coated)
LB
2010
2412.502
16 X 5 PC Concrete Box Culvert End Section Type III 30 deg Skew Left
Each
2
2412.503
16 X 5 PC Concrete Box Culvert Class 1
LF
50
2442.501
Remove Existing Bridge
LS
1
2451.507
Coarse Aggregate Bedding (CV)
CY
134
2511.509
Random Riprap Cl IV
Ton
176
2563.601
Traffic Control
LS
1
2573.503
Sediment Control Log Type Straw
LF
48
2575.504
Rolled Erosion Prevention Cat 20
SY
1785
2575.505
Seeding
Acre
0.4
Contract Owner
Fillmore County
909 Houston St NW
Preston, MN   55965
fax:
507-765-4476
Contract Engineer
Josh Lensing
909 Houston St NW
Preston, MN   55965
fax:
507-765-4476