Contract Number:
2026-13
Projects:
2026-13
Other Projects:
Contract Description:
2026 Riverside Court Forcemain
Construction Location:
Riverside Court, Faribault, MN 55021
City or Township:
Bid Opening Date & Time:
11/4/2026, 5:00 PM
Award Date:
11/10/2026
Contract Start Date:
11/16/2026
Construction Start Date:
11/16/2026
Construction End Date:
12/31/2026
Work Type:
Water Main/Storm Sewer/Sanitary Sewer
Project Type:
Sewer and Water
Highest Funding Level:
Local
DBE:
No
Riverside Court Forcemain Construction
| Number | Description | Unit | Quantity |
|---|---|---|---|
2503.602 | AIR/VACUUM RELEASE MANHOLE (W/ 2 VALVES) | EACH | 1 |
2503.603 | 2" HDPE DR11 IPS (HDD) FORCEMAIN | LF | 180 |
2503.603 | 3" HDPE DR11 IPS (HDD) FORCEMAIN | LF | 845 |
2503.603 | 8" HDPE DR 11 IPS (HDD) CASING | LF | 295 |
2504.602/03200 | 2" CURB STOP & BOX | EACH | 3 |
Contract Owner
Contract Engineer