| 11/18/2025, 8:00 PM | Hennepin County, MN | CSAH 152 Bassett Creek Tunnel Rehabilitation | 2176400 | Bridges | Bridge, Concrete, Structural | |
| 11/20/2025, 4:00 PM | Rice County, MN | CSAH 11 Slope Stabilization | 2576 | Specialized Construction | Bituminous, Grading, Reconstruct, Structural | |
| 12/2/2025, 4:00 PM | Mower County, MN | SP 50-607-043 | 22325 | Bridges | Bridge, Reconstruct | No Location Available |
| 12/3/2025, 3:00 PM | Carlton County, MN | TH 73 Cromwell Shared-Use Trail | 090007 | Road and Street | Trail Construction | |
| 12/4/2025, 4:00 PM | St. Louis County, MN | CP 0133-778334, SAP 069-733-034 (Br 820) (Low); CP 0133-778340, SAP 069-733-033 (Br 203) (Tied); CP 0133-914505, SAP 069-733-036 (Tied) | CP 0133-778334 | Bridges | Bridge | |
| 12/4/2025, 4:00 PM | St. Louis County, MN | MP 0000-926080 | CP 0000-926080 | Road and Street | Bituminous | |
| 12/8/2025, 3:00 PM | Fillmore County, MN | Bridge Replacment with Culvert | SAP 023-599-219 | Road and Street | Pipe and Culvert | |
| 12/8/2025, 3:30 PM | Fillmore County, MN | Bridge replacement with Culvert | LOST 9949-104 | Road and Street | Pipe and Culvert | |
| 12/8/2025, 4:30 PM | Fillmore County, MN | Full Depth Reclamation, Bituminous Surfacing, Aggregate Shouldering & Striping | SAP 023-602-024, SAP 023-605-042, SAP 023-605-041 | Road and Street | Bituminous | |
| 12/8/2025, 5:00 PM | Fillmore County, MN | Full Depth Reclamation, Bituminous Surfacing, Aggregate Shouldering & Striping | LOST 119P-1 | Road and Street | Bituminous | |
| 12/8/2025, 8:00 PM | Aitkin County, MN | CP 001-090-045 2026 Crack Sealing | 20262 | Maintenance | Surfacing | |
| 12/9/2025, 4:00 PM | Chippewa County, MN | TH 7 - CR 15 Pedestrian Crossing Improvements (HAWK System) | SP 012-596-001 | Road and Street | Bituminous, Concrete, Electrical, Traffic Control, Traffic Marking/Striping, Trail Construction | |
| 12/9/2025, 8:00 PM | Hennepin County, MN | 2026 Pavement Preservation | 4630005 | Road and Street | Bituminous, Surfacing, Traffic Marking/Striping | |
| 12/10/2025, 8:00 PM | City of Marshall, MN | Main Lift Station Renovation | WW-046 | Sewer and Water | Water Main/Storm Sewer/Sanitary Sewer | No Location Available |
| 12/18/2025, 4:00 PM | St. Louis County, MN | CP 0010-603328, SAP 069-610-011 (Low)(Low Prime); CP 0044-401137, SAP 069-644-031 (Tied); CP 0044-655282, SAP 069-644-032 (Tied); CP 0044-943982 (Tied) | CP 0010-603328 | Road and Street | Bituminous, Grading | |
| 2/24/2026, 4:00 PM | Wsb, MN | Buschmann Road and Ranchette Drive Improvements | 022038-000 | Road and Street | Aggregate, Bituminous, Concrete, Grading, Reconstruct, Surfacing, Water Main/Storm Sewer/Sanitary Sewer, Excavation, Clearing and Grubbing | |
| 4/7/2026, 4:00 PM | City of Rochester, MN | J7829 Upgrade Replace Zumbro River Siphon at Silver Lake; Serving East Zumbro Sewer District | J7829 | | | |