Contract Number:
CP-24-6905
Projects:
CP-24-6905
Other Projects:
CP 24-6905
Contract Description:
CONSTRUCT BRIDGE NO. R1123 AND REPAIR BRIDGE NO. R0631
Construction Location:
On Dakota Rail Regional Trail Over Crane Creek (Judicial Ditch 1) and Crane Creek Overflow, in Camden Township, west of New Germany.
City or Township:
Camden Township

Bid Opening Date & Time:
6/23/2026, 3:00 PM
Award Date:
7/21/2026
Contract Start Date:
7/21/2026
Construction Start Date:
8/3/2026
Construction End Date:
10/1/2026
Work Type:
Aggregate, Bridge, Pipe and Culvert, Excavation
Project Type:
Bridges
Highest Funding Level:
Local
DBE:
No
Construct Bridge No. R1123 and repair Bridge No. R0631 On Dakota Rail Regional Trail Over Crane Creek (Judicial Ditch 1) and Crane Creek Overflow, in Camden Township, west of New Germany.
Major Items
NumberDescriptionUnitQuantity
2021.501/00010
MOBILIZATION
LUMP SUM
2
2401.601/00010
STRUCTURE EXCAVATION
LUMP SUM
1
2403.622/00020
TREATED TIMBER
MBM
8.85
2412.502
14X5 PRECAST CONCRETE BOX CULVERT END SECTION
EACH
2
2412.503
14X5 PRECAST CONCRETE BOX CULVERT
LIN. FT.
40
2433.501/00010
STRUCTURE REMOVALS
LUMP SUM
1
2442.501/00010
REMOVE EXISTING BRIDGE
LUMP SUM
1
2451.607
STRUCTURAL BACKFILL
CU. YD.
700
2452.601
HELICAL PILES
LUMP SUM
1
Contract Owner
Sellner, Anthony
11360 US Route 212
1
Cologne, MN   55322
Contract Engineer
Clemens, Chad
11360 Hwy 212
Cologne, MN   55322