Contract Number:
269002
Projects:
SAP 024-590-002
Other Projects:
Contract Description:
Songbird Trail
Construction Location:
LOCATED ALONG ABANDONED UNION PACIFIC LINE FROM FOUNTAIN STREET IN ALBERT LEA TO 3900' SOUTH OF INTERSTATE I-90
City or Township:
Bid Opening Date & Time:
6/2/2026, 4:00 PM
Award Date:
7/21/2026
Contract Start Date:
7/21/2026
Construction Start Date:
7/21/2026
Construction End Date:
6/4/2027
Work Type:
Bituminous, Bridge, Concrete, Grading, Pipe and Culvert, Clearing and Grubbing, Trail Construction
Project Type:
Road and Street
Highest Funding Level:
State
DBE:
No
Grading, Bituminous Surfacing, ADA Improvements and Bridges R1144, R1145, R1146, R1147;
| Number | Description | Unit | Quantity |
|---|---|---|---|
2104.507/00450 | REMOVE AGGREGATE | C Y | 2701 |
2106.507/00010 | EXCAVATION - COMMON | C Y | 1630 |
2106.507/00130 | COMMON EMBANKMENT (CV) | C Y | 3424 |
2211.507/00170 | AGGREGATE BASE (CV) CLASS 5 | C Y | 1172 |
2360.504 | TYPE SP 9.5 WEAR CRS MIX (2,B) 3.0" THICK | SQ YD | 6791 |
2401.507/03643 | STRUCTURAL CONCRETE (3B52) | C Y | 43 |
2402.601/00131 | PEDESTRIAN BRIDGE (SUPERSTRUCTURE) | LS | 1 |
2403.502 | PREFAB WOOD PANELS TYPE C12 | EACH | 28 |
2403.622/00020 | TREATED TIMBER | MBM | 8.704 |
2521.518/00040 | 4" CONCRETE WALK | S F | 1620 |
2521.618/00400 | CONCRETE CURB RAMP WALK | S F | 1800 |
2531.503/02315 | CONCRETE CURB & GUTTER DESIGN B618 | L F | 566 |
Contract Owner
Contract Engineer