Contract Number:
SWM-003
Projects:
SWM-003
Other Projects:
Contract Description:
LEGION FIELD ROAD FLOOD MITAGATION PHASE 3
Construction Location:
PROJECT IS BOUND BY SOUTH 10TH STREET, LEGION FIELD ROAD, BNSF RAILROAD AND SOUTH 8TH STREET. LOCATED IN SECTION 5 T111N R 41W
City or Township:

Bid Opening Date & Time:
5/27/2026, 6:00 PM
Award Date:
6/9/2026
Contract Start Date:
6/24/2026
Construction Start Date:
6/24/2026
Construction End Date:
6/5/2027
Work Type:
Grading
Project Type:
Drainage
Highest Funding Level:
Local
DBE:
No
This project consists of the following: Storm Sewer, Pond Grading, Ditch Grading and Turf Restoration.
Major Items
NumberDescriptionUnitQuantity
2106.507
COMMON EXCAVATION (P)
CY
12994
2451.507
COARSE AGGREGATE BEDDING (CV) (P)
CY
144
2451.507
COARSE FILTER AGGREGATE (CV) (P)
CY
110
2502.503/08040
4" PERF TP PIPE DRAIN
L F
1129
2502.503/08060
6" PERF TP PIPE DRAIN
L F
670
2503.503/19303
30" RC PIPE SEWER DES 3006 CL III
L F
373
2503.503/19363
36" RC PIPE SEWER DES 3006 CL III
L F
889
2503.503/19429
42" RCP SEWER DES 3006 CL V-JACKED
L F
80
2506.503/00300
CONST DRAINAGE STRUCTURE DESIGN SPECIAL
L F
9.7
2506.503/03620
CONST DRAINAGE STRUCTURE DES 72-4020
L F
18.4
2575.501/00010
SEEDING
ACRE
11.5
Contract Owner
Hanson, Eric
344 W. MAIN ST.
MARSHALL, MN   56258
Contract Engineer
Anderson, Jason
344 West Main St.
Marshall, MN   56258