Contract Number:
SAUKR 181010
Projects:
SP 191-104-009 & 191-090-003
Other Projects:
Minn. Proj. No. TA 0526(229)
Contract Description:
2026 2nd Avenue South (MSAS 104) Pedestrian Railroad Crossing Improvements
Construction Location:
Sauk Rapids, Minnesota
City or Township:
Sauk Rapids

Bid Opening Date & Time:
5/19/2026, 4:00 PM
Award Date:
5/26/2026
Contract Start Date:
5/26/2026
Construction Start Date:
6/15/2026
Construction End Date:
6/25/2027
Work Type:
Reconstruct, Water Main/Storm Sewer/Sanitary Sewer, Excavation
Project Type:
Road and Street
Highest Funding Level:
Federal
DBE:
No
2nd Avenue South from 6th Street South to Benton Drive
Major Items
NumberDescriptionUnitQuantity
0
20-INCH STEEL CASING PIPE (JACKED) WITH 8-INCH WATERMAIN DI CL 52 CARRIER PIPE
LIN FT
205
0
4-INCH TO 6-INCH CONCRETE WALK
SQ FT
2572
0
8-INCH WATERMAIN DUCTILE IRON CL 52
LIN FT
85
0
AGGREGATE BASE (CV) CLASS 5 (P)
CU YD
478
0
BITUMINOUS PAVING MIX
TON
258
0
CONCRETE CURB DESIGN B8
LIN FT
397
0
CONCRETE CURB & GUTTER DESIGN B618
LIN FT
576
0
CROSSWALK PREF THERMO GR IN (WHITE)
SQ FT
636
0
EXCAVATION - COMMON (P)
CU YD
626
0
FLAGGER
HOUR
40
0
PAVEMENT MARKING REMOVAL
SQ FT
540
0
REMOVE BITUMINOUS PAVEMENT
SQ YD
1300
0
REMOVE CONCRETE WALK
SQ YD
288
0
REMOVE CURB & GUTTER
LIN FT
882
0
REVISE SIGNAL SYSTEM
SYS
1
0
ROLLED EROSION PREVENTION CATEGORY 25
SQ YD
100
0
SAWING CONCRETE PAVEMENT / SAWING BIT PAVEMENT
LIN FT
397
0
SEEDING
ACRE
0.1
0
SIGN PANEL
SQ FT
90
0
SOLID LINE MULTI COMP
LIN FT
636
Contract Owner
City of Sauk Rapids
250 Summit Avenue North
Sauk Rapids, MN   56379
Contract Engineer
Short Elliott Hendrickson Inc.
2351 Connecticut Avenue South
300
Sartell, MN   56377