Name:
East Lyon Street Bike Trail
Number:
PK-012
Bid Opening:
Oct 6, 2026, 3:00 PM
Agency:
City of Marshall
Ad For Bid
Ad for Bids (PK-012).pdf
| Project Number | Project Title | Author | Manager | |
|---|---|---|---|---|
PK-012 | East Lyon Street Bike Trail | Stelter, Geoff | Stelter, Geoff |
Correspondence
Owner Messages
0 Total
| Name | Contact Information | Designation | DBE |
|---|---|---|---|
Hunt Electric Corporation DBA River City Electric | Mark D Draper mdraper@huntelec.com 507 317 1259 | Subcontractor | |
Ti-Zack Concrete, LLC | estimating@tizack.com | Prime |
Plans Available for Download
139-090-007FinalPlanSigned.pdf
2025 MnDOT Standard Specifications for Construction-38774551-v3 (1).pdf
2026 SALT Schedule of Materials Control.pdf
Form SDE - Exemption from Surety Deposits for Non-Minnesota Contractors.pdf
Project Manual (PK-012) - Signed.pdf
| Number | Date | Files |
|---|
No data available
Location