Contract Number:
2026-02
Projects:
2026-02
Other Projects:
Contract Description:
2026 MSA Street Overlay Improvements
Construction Location:
Faribault MN
City or Township:
Faribault

Bid Opening Date & Time:
3/18/2026, 4:00 PM
Award Date:
3/24/2026
Contract Start Date:
6/1/2026
Construction Start Date:
6/1/2026
Construction End Date:
8/1/2026
Work Type:
Mill and Overlay
Project Type:
Road and Street
Highest Funding Level:
State
DBE:
No
Mill and Overlay
Major Items
NumberDescriptionUnitQuantity
2232.604/00471
MILL BITUMINOUS SURFACE TYPE 1
S Y
2100
2232.604/00472
MILL BITUMINOUS SURFACE TYPE 2
S Y
7700
2360.509/23200
TYPE SP 12.5 WEARING COURSE MIX (3,B)
TON
1200
2360.604/0010
IRREGULAR WIDTH PAVING TYPE 1
SY
1300
2506.502/06020/SAN
ADJUST FRAME & RING CASTING SANITARY
EACH
12
2506.502/06022
ADJUST FRAME & RING CASTING STORM
EACH
12
2521.518/00040
4" CONCRETE WALK
S F
1920
2521.518/00060
6" CONCRETE WALK
S F
2670
2531.503/02315
CONCRETE CURB & GUTTER DESIGN B618
L F
450
2531.503/02320
CONCRETE CURB & GUTTER DESIGN B624
L F
350
2582.503/30404
4" DBLE SOLID LINE MULTI COMP
L F
1996
Contract Owner
Mark DuChene
1200 Belview Trail
Faribault, MN   55021
Contract Engineer
Mark DuChene
1200 Belview Trail
Faribault, MN   55021