Contract Number:
ST-013
Projects:
ST-013
Other Projects:
Contract Description:
North High Street Reconstruction
Construction Location:
From the intersection of North 4th Street and North High Street to the intersection of North High Street and Oak Street, also including the alley bound by North 5th Street, North 6th Street, North High Street, and Elm Street.
City or Township:
Marshall
Bid Opening Date & Time:
3/17/2026, 3:00 PM
Award Date:
3/24/2026
Contract Start Date:
5/4/2026
Construction Start Date:
5/4/2026
Construction End Date:
10/2/2026
Work Type:
Reconstruct
Project Type:
Road and Street
Highest Funding Level:
Local
DBE:
No
This project consists of: reconstruction and utility replacement on North High Street from North 4th Street to Oak Street, and sanitary sewer replacement in the alley between North 5th Street to North 6th Street. All utilities will be replaced, including watermain, sanitary sewer, and storm sewer within the areas identified above. This project will include new water and sewer services to the right-of-way. Other items of work included in this project are pavement removal, aggregate base, bituminous surfacing, concrete driveways, sidewalks, curb and gutter and other minor work.
| Number | Description | Unit | Quantity |
|---|---|---|---|
2106.607 | COMMON EXCAVATION | CU YD | 2460 |
2211.607 | AGGREGATE BASE (CV) CLASS 5 | CY YD | 2025 |
2360.609 | TYPE SP 9.5 WEARING COURSE MIX (3,C) | TON | 1170 |
2503.603 | 15" RC PIPE SEWER CLASS III | L F | 700 |
2503.603/00108 | 8" PVC PIPE SEWER | L F | 809 |
2504.602/00006 | 1" WATER SERVICE (COMPLETE) | EACH | 16 |
2504.603/02006 | 6" PVC WATERMAIN | L F | 990 |
2521.518/00040 | 4" CONCRETE WALK | S F | 8313 |
2521.518/00060 | 6" CONCRETE WALK | S F | 1743 |
2531.503/02315 | CONCRETE CURB & GUTTER DESIGN B618 | L F | 2851 |