Contract Number:
2604
Projects:
SP 051-602-021
Other Projects:
SAP 051-616-008: SAP 051-616-008 SAP 051-630-024: SAP 051-630-024 SP 051-634-016: SP 051-634-016
Contract Description:
2026 Bituminous Overlay and ADA Ramps
Construction Location:
CSAH 2, 16, 30, 34
City or Township:

Bid Opening Date & Time:
4/16/2026, 2:00 PM
Award Date:
4/21/2026
Contract Start Date:
5/15/2026
Construction Start Date:
5/15/2026
Construction End Date:
8/15/2026
Work Type:
Bituminous, Traffic Marking/Striping
Project Type:
Road and Street
Highest Funding Level:
Federal
DBE:
No
Two projects are State Aid bituminous overlays, and Two projects are Federal Aid bituminous overlays with one project in the City Limits of Fulda which has milling and ADA ramps.
Major Items
NumberDescriptionUnitQuantity
2104.503
REMOVE CURB AND GUTTER
LIN. FT.
443
2104.518
REMOVE CONCRETE SIDEWALK
SQ. FT.
1707
2104.603
REMOVE CONCRETE GUTTER
LIN. FT.
229
2106.603
SHOULDER EXCAVATION
LIN FT
103148
2106.603
SHOULDER EXCAVATION
LIN. FT.
40054
2118.509
AGGREGATE SURFACING CLASS 1
TON
8325
2232.504
MILL BITUMINOUS SURFACE (2")
SQ YD
1345
2232.504
MILL BITUMINOUS SURFACE (2.0")
SQ. YD.
13997
2360.509
TYPE SP 12.5 BIT. MIXTURE FOR PATCHING (2,B)
TON
6100
2360.509
TYPE SP 12.5 WEARING COURSE MIXTURE (2,B)
TON
32385
2504.602
ADJUST GATE VALVE
EACH
4
2506.502
ADJUST FRAME AND RING CASTING
EACH
7
2521.618
CONCRETE WALK
SQ. FT.
1635
2531.603
CONCRETE CURB AND GUTTER DESIGN B618
LIN. FT.
443
2531.618
TRUNCATED DOMES
SQ. FT.
168
2582.503
24" SOLID LINE PAINT
LIN FT
36
2582.503
24" SOLID LINE PAINT
LIN. FT.
79
2582.503
4" BROKEN LINE PAINT
LIN FT
8440
2582.503
4" BROKEN LINE PAINT
LIN. FT.
5070
2582.503
4" SOLID LINE PAINT
LIN FT
178445
2582.503
4" SOLID LINE PAINT
LIN. FT.
52667
2582.518
CROSSWALK PAINT
SQ. FT.
1764
2582.518
PAVEMENT MESSAGE PAINT
SQ FT
147
2582.518
PAVEMENT MESSAGE PAINT
SQ. FT.
98
Contract Owner
Rossow, Keith
1449 State Hwy 30
Slayton, MN   56172
Contract Engineer
Groves, Randy
1449 State Hwy 30
Slayton, MN   56172