Contract Number:
TH 41 Trail Crossing
Projects:
SP 1008-118
Other Projects:
SP 1008-118: CP 258986
Contract Description:
Construction of TH 41 trail underpass box culvert
Construction Location:
ON HIGHWAY 41 AT 0.36 MILES NORTH OF HIGHWAY 5 IN THE CITY OF CHANHASSEN
City or Township:
Bid Opening Date & Time:
2/17/2026, 4:00 PM
Award Date:
3/10/2026
Contract Start Date:
3/10/2026
Construction Start Date:
3/5/2026
Construction End Date:
6/5/2026
Work Type:
Aggregate, Bituminous, Bridge, Electrical, Clearing and Grubbing, Trail Construction
Project Type:
Bridges
Highest Funding Level:
State
DBE:
No
Construction of TH 41 trail underpass box culvert
| Number | Description | Unit | Quantity |
|---|---|---|---|
2101.502/00020 | CLEARING | ACRE | 2 |
2101.502/00030 | GRUBBING | ACRE | 2 |
2106.507/00010 | EXCAVATION - COMMON | CU YD | 20427 |
2106.507/00080 | SELECT GRANULAR EMBANKMENT (CV) | CU YD | 3149 |
2211.507/00170 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 276 |
2360.509/12200 | TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) | TON | 207 |
2411.507/01143 | STRUCTURAL CONCRETE (1G52) | CU YD | 114 |
2411.507/03143 | STRUCTURAL CONCRETE (3G52) | CU YD | 138 |
2411.508/00010 | REINFORCEMENT BARS | POUND | 12880 |
2411.508/00011 | REINFORCEMENT BARS (EPOXY COATED) | POUND | 22450 |
2411.601/00005 | STRUCTURE EXCAVATION | LUMP SUM | 1 |
2451.607/00520 | STRUCTURAL BACKFILL | CU YD | 719 |
2502.503/08040 | 4" PERF TP PIPE DRAIN | LIN FT | 1085 |
2503.503/19155 | 15" RC PIPE SEWER DESIGN 3006 CLASS V | LIN FT | 382 |
2504.603/02012 | 12" PVC WATERMAIN | LIN FT | 343 |
2504.608/00020 | DUCTILE IRON FITTINGS | POUND | 1149 |
2572.503/00030 | CLEAN ROOT CUTTING | LIN FT | 1010 |
2575.504/00310 | ROLLED EROSION PREVENTION CATEGORY 10 | SQ YD | 6440 |
2575.504/00325 | ROLLED EROSION PREVENTION CATEGORY 25 | SQ YD | 1826 |
2575.505/00021 | SEEDING | ACRE | 2 |
2575.523/00020 | RAPID STABILIZATION METHOD 3 | M GALLON | 21 |
Contract Owner