Contract Number:
TH 41 Trail Crossing
Projects:
SP 1008-118
Other Projects:
SP 1008-118: CP 258986
Contract Description:
Construction of TH 41 trail underpass box culvert
Construction Location:
ON HIGHWAY 41 AT 0.36 MILES NORTH OF HIGHWAY 5 IN THE CITY OF CHANHASSEN
City or Township:

Bid Opening Date & Time:
2/17/2026, 4:00 PM
Award Date:
3/10/2026
Contract Start Date:
3/10/2026
Construction Start Date:
3/5/2026
Construction End Date:
6/5/2026
Work Type:
Aggregate, Bituminous, Bridge, Electrical, Clearing and Grubbing, Trail Construction
Project Type:
Bridges
Highest Funding Level:
State
DBE:
No
Construction of TH 41 trail underpass box culvert
Major Items
NumberDescriptionUnitQuantity
2101.502/00020
CLEARING
ACRE
2
2101.502/00030
GRUBBING
ACRE
2
2106.507/00010
EXCAVATION - COMMON
CU YD
20427
2106.507/00080
SELECT GRANULAR EMBANKMENT (CV)
CU YD
3149
2211.507/00170
AGGREGATE BASE (CV) CLASS 5
CU YD
276
2360.509/12200
TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)
TON
207
2411.507/01143
STRUCTURAL CONCRETE (1G52)
CU YD
114
2411.507/03143
STRUCTURAL CONCRETE (3G52)
CU YD
138
2411.508/00010
REINFORCEMENT BARS
POUND
12880
2411.508/00011
REINFORCEMENT BARS (EPOXY COATED)
POUND
22450
2411.601/00005
STRUCTURE EXCAVATION
LUMP SUM
1
2451.607/00520
STRUCTURAL BACKFILL
CU YD
719
2502.503/08040
4" PERF TP PIPE DRAIN
LIN FT
1085
2503.503/19155
15" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
382
2504.603/02012
12" PVC WATERMAIN
LIN FT
343
2504.608/00020
DUCTILE IRON FITTINGS
POUND
1149
2572.503/00030
CLEAN ROOT CUTTING
LIN FT
1010
2575.504/00310
ROLLED EROSION PREVENTION CATEGORY 10
SQ YD
6440
2575.504/00325
ROLLED EROSION PREVENTION CATEGORY 25
SQ YD
1826
2575.505/00021
SEEDING
ACRE
2
2575.523/00020
RAPID STABILIZATION METHOD 3
M GALLON
21
Contract Owner
Weiers, Luke
11360 Highway 212
Suite 1
Cologne, MN   55322
Contract Engineer
Maine, Derek
11360 Highway 212
Suite 1
Cologne, MN   55322