Contract Number:
CP 0021-556743
Projects:
CP 0021-556743
Other Projects:
CP 0021-556743: SAP 069-621-040
Contract Description:
CP 0021-556743, SAP 069-621-040 (Br 529)
Construction Location:
CSAH 21 between Hwy 169 and CR 792
City or Township:

Bid Opening Date & Time:
1/29/2026, 4:00 PM
Award Date:
2/24/2026
Contract Start Date:
6/15/2026
Construction Start Date:
6/15/2026
Construction End Date:
10/31/2026
Work Type:
Bridge
Project Type:
Bridges
Highest Funding Level:
State
DBE:
No
County Bridge 529 is located on CSAH 21, 0.3 miles E of TH 169, in Pike Township, and about 9.5 miles NE of Virginia, MN. The project requires bridge removal, construction of a double 20' precast concrete box culvert, moment slab plus barrier, guardrail, and approach grading and bituminous paving.
Major Items
NumberDescriptionUnitQuantity
2106.507/00100
SELECT GRANULAR EMBANKMENT MOD 7% (CV)
CU YD
3148
2360.509/22300
TYPE SP 12.5 WEARING COURSE MIXTURE (2,C)
TON
896
2412.503/69001
20X10 PRECAST CONCRETE BOX CULVERT
LIN FT
112
2501.503/19882
88" SPAN RC PIPE-ARCH CULVERT CLASS IIA
LIN FT
108
2501.507/00020
CULVERT EXCAVATION CLASS U
CU YD
3536
Contract Owner
St. Louis Co., Bid Information
4787 Midway Road
Duluth, MN   55811
Contract Engineer
Gregg, Rachel
1425 East 23rd Street
Hibbing, MN   55746