Contract Number:
CP 016-688-001
Projects:
CP 016-688-001
Other Projects:
Contract Description:
CULVERT REMOVAL AND REPLACEMENT, FULL DEPTH RECLAMATION, AND BITUMINOUS SURFACING OF UT 88 CHICAGO BAY ROAD
Construction Location:
LOCATED ON UT 88 BETWEEN SOUTH JUNCTION WITH HIGHWAY 61 AND NORTH JUNCTION WITH HIGHWAY 61
City or Township:
Hovland
Bid Opening Date & Time:
2/10/2026, 8:00 PM
Award Date:
3/3/2026
Contract Start Date:
7/6/2026
Construction Start Date:
7/6/2026
Construction End Date:
10/2/2026
Work Type:
Bituminous, Pipe and Culvert
Project Type:
Road and Street
Highest Funding Level:
Local
DBE:
No
CULVERT REMOVAL AND REPLACEMENT, FULL DEPTH RECLAMATION, AND BITUMINOUS SURFACING OF UT 88 CHICAGO BAY ROAD
| Number | Description | Unit | Quantity |
|---|---|---|---|
2104.503 | REMOVE PIPE CULVERTS | LF | 409 |
2215.504 | FULL DEPTH RECLAMATION | SY | 8113 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) | TON | 1911 |
2501.502/02018 | 18" CAS PIPE APRON | EACH | 22 |
2501.502/05018 | 18" RC PIPE APRON | EACH | 8 |
2501.503 | 18" CAS PIPE CULVERT | LF | 292 |
2501.503 | 18" RC PIPE CULVERT DESIGN 3006 CLASS lll | LF | 72 |
Contract Owner
Contract Engineer