Contract Number:
9007
Projects:
SP 083-090-007
Other Projects:
SP 083-090-007: 9007 SAP 083-090-007 HSIP-TAP 8325 (130)
Contract Description:
WatLine Trail State II
Construction Location:
Along TH 4 between CSAH 10 and Ormsby City Park
City of Township:
Bid Opening Date & Time:
8/19/2025, 3:00 PM
Award Date:
9/2/2025
Contract Start Date:
9/15/2025
Construction Start Date:
9/15/2025
Construction End Date:
6/30/2026
Work Type:
Aggregate, Bituminous, Bridge, Concrete, Grading, Pipe and Culvert, Traffic Control, Excavation, Clearing and Grubbing, Trail Construction
Project Type:
Road and Street
Highest Funding Level:
Federal
DBE:
Yes
Bike trail along old rail bed between CSAH 10 and the City of Ormsby adjacent to TH 4
Number | Description | Unit | Quantity |
---|---|---|---|
2106.507 | EXCAVATION - COMMON | CY | 19042 |
2360.504 | TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 3" THICKNESS | SY | 23197 |
2401.507 | STRUCTURAL CONCRETE (3B52) | CU YD | 37 |
2402.601/00131 | PEDESTRIAN BRIDGE (SUPERSTRUCTURE) | LUMP SUM | 1 |
2452.503 | C-I-P CONCRETE PILING 12" | LIN FT | 200 |
2501.503 | 12" RC PIPE CULVERT CLASS III | LF | 87 |
2501.503 | 15" RC PIPE CULVERT CLASS III | LF | 27 |
2501.503 | 24" RC PIPE CULVERT CLASS III | LF | 116 |
2501.503 | 30" RC PIPE CULVERT CLASS III | LF | 33 |
2501.503 | 36" RC PIPE CULVERT CLASS III | LF | 33 |
2511.509/00013 | RANDOM RIPRAP CLASS III | TON | 520 |
2521.518 | 5" CONCRETE WALK | SF | 580 |
2563.601/00010 | TRAFFIC CONTROL | LS | 1 |
2564.502 | INSTALL SIGN PANEL | EA | 4 |
2573.503 | FLOTATION SILT CURTAIN TYPE MOVING WATER | LF | 57 |
2575.505 | SEEDING | AC | 6.65 |
2582.518 | PAVEMENT MESSAGE MULTI-COMPONENT | SF | 420 |
Contract Owner
McCarty, Michael
1304 7th Avenue South
Saint James, MN 56081
Contract Engineer
McCarty, Michael
1304 7th Avenue South
Saint James, MN 56081