Contract Number:
PK-011
Projects:
PK-011
Other Projects:
PK-011: SP 139-090-009
Contract Description:
C Street and Southview Trail
Construction Location:
Section 9 T111N R41W From the intersection of C Street and Progress Drive to the intersection of Southview Drive and East Main Street.
City of Township:
Marshall
Bid Opening Date & Time:
7/8/2025, 4:00 PM
Award Date:
7/22/2025
Contract Start Date:
8/4/2025
Construction Start Date:
8/4/2025
Construction End Date:
6/26/2026
Work Type:
Trail Construction
Project Type:
Parks and Recreation
Highest Funding Level:
State
DBE:
No
The project includes for the installation of a 10-FT wide concrete trail from C Street to Southview Drive that generally runs parallel with Progress Drive. The trail then extends to the east along the south side of Southview Drive as an 8-FT wide concrete trail, ending at the intersection of Southview Drive and US 59/Main Street. Lastly, an 8-FT extension leads from the trail to existing walk at the Southview Elementary School to provide a link to the front door of the school.
Number | Description | Unit | Quantity |
---|---|---|---|
2104.518/00080 | REMOVE SIDEWALK | S F | 3814 |
2211.507/00170 | AGGREGATE BASE (CV) CLASS 5 | C Y | 464 |
2231.604/00010 | BITUMINOUS PATCH SPECIAL | S Y | 92 |
2521.518/00050 | 5" CONCRETE WALK | S F | 33315 |
2521.518/00060 | 6" CONCRETE WALK | S F | 2436 |
2531.503/02315 | CONCRETE CURB & GUTTER DESIGN B618 | L F | 350 |
2531.504/00060 | 6" CONCRETE DRIVEWAY PAVEMENT | S Y | 162 |