Contract Number:
PK-011
Projects:
PK-011
Other Projects:
PK-011: SP 139-090-009
Contract Description:
C Street and Southview Trail
Construction Location:
Section 9 T111N R41W From the intersection of C Street and Progress Drive to the intersection of Southview Drive and East Main Street.
City of Township:
Marshall

Bid Opening Date & Time:
7/8/2025, 4:00 PM
Award Date:
7/22/2025
Contract Start Date:
8/4/2025
Construction Start Date:
8/4/2025
Construction End Date:
6/26/2026
Work Type:
Trail Construction
Project Type:
Parks and Recreation
Highest Funding Level:
State
DBE:
No
The project includes for the installation of a 10-FT wide concrete trail from C Street to Southview Drive that generally runs parallel with Progress Drive. The trail then extends to the east along the south side of Southview Drive as an 8-FT wide concrete trail, ending at the intersection of Southview Drive and US 59/Main Street. Lastly, an 8-FT extension leads from the trail to existing walk at the Southview Elementary School to provide a link to the front door of the school.
Major Items
NumberDescriptionUnitQuantity
2104.518/00080
REMOVE SIDEWALK
S F
3814
2211.507/00170
AGGREGATE BASE (CV) CLASS 5
C Y
464
2231.604/00010
BITUMINOUS PATCH SPECIAL
S Y
92
2521.518/00050
5" CONCRETE WALK
S F
33315
2521.518/00060
6" CONCRETE WALK
S F
2436
2531.503/02315
CONCRETE CURB & GUTTER DESIGN B618
L F
350
2531.504/00060
6" CONCRETE DRIVEWAY PAVEMENT
S Y
162
Contract Owner
Hanson, Eric
344 W. MAIN ST.
MARSHALL, MN   56258
Contract Engineer
Anderson, Jason
344 West Main St.
Marshall, MN   56258