Contract Number:
SARTE 179498
Projects:
SP No. 220-070-001
Other Projects:
Minn. Proj. No. HSIP 7325(297)
Contract Description:
TRAFFIC SIGNAL SYSTEM AND ADA CURB RAMP IMPROVEMENTS
Construction Location:
Sartell, MN
City of Township:

Bid Opening Date & Time:
7/2/2025, 4:00 PM
Award Date:
7/14/2025
Contract Start Date:
7/14/2025
Construction Start Date:
8/4/2025
Construction End Date:
2/1/2026
Work Type:
Traffic Control
Project Type:
Specialized Construction
Highest Funding Level:
Federal
DBE:
Yes
Pinecone Road & 7th Street North Improvements
Major Items
NumberDescriptionUnitQuantity
0
6-Inch Concrete Walk
SQ FT
1263
0
Concrete Curb and Gutter Design B618
LIN FT
116
0
Mill and Patch Bituminous Pavement
SQ FT
234
0
Remove Concrete Walk and Bituminous Walk
SQ FT
1084
0
Remove Curb and Gutter
LIN FT
112
0
Traffic Control Interconnect (connection to City fiber)
LUMP SUM
1
0
Traffic Control Signal System
SYSTEM
1
Contract Owner
City of Sartell
125 Pine Cone Road North
125 Pinecone Road north
Sartell, MN   56377
Contract Engineer
John Gray
2351 Connecticut Avenue South
Suite 300
Sartell, MN   56377