Contract Number:
SARTE 179498
Projects:
SP No. 220-070-001
Other Projects:
Minn. Proj. No. HSIP 7325(297)
Contract Description:
TRAFFIC SIGNAL SYSTEM AND ADA CURB RAMP IMPROVEMENTS
Construction Location:
Sartell, MN
City of Township:
Bid Opening Date & Time:
7/2/2025, 4:00 PM
Award Date:
7/14/2025
Contract Start Date:
7/14/2025
Construction Start Date:
8/4/2025
Construction End Date:
2/1/2026
Work Type:
Traffic Control
Project Type:
Specialized Construction
Highest Funding Level:
Federal
DBE:
Yes
Pinecone Road & 7th Street North Improvements
Number | Description | Unit | Quantity |
---|---|---|---|
0 | 6-Inch Concrete Walk | SQ FT | 1263 |
0 | Concrete Curb and Gutter Design B618 | LIN FT | 116 |
0 | Mill and Patch Bituminous Pavement | SQ FT | 234 |
0 | Remove Concrete Walk and Bituminous Walk | SQ FT | 1084 |
0 | Remove Curb and Gutter | LIN FT | 112 |
0 | Traffic Control Interconnect (connection to City fiber) | LUMP SUM | 1 |
0 | Traffic Control Signal System | SYSTEM | 1 |
Contract Owner
City of Sartell
125 Pine Cone Road North
125 Pinecone Road north
Sartell, MN 56377
Contract Engineer