Contract Number:
202502
Projects:
SAP 017-615-024
Other Projects:
Contract Description:
CSAH 15 Bridge replacement
Construction Location:
Located on CSAH 15 from 0.3 miles west of Jct. CSAH 13 to 0.2 miles west of Jct. CSAH 13. Approximately 3.2 miles northwest of Windom, MN
City of Township:
WINDOM

Bid Opening Date & Time:
6/26/2025, 3:00 PM
Award Date:
7/1/2025
Contract Start Date:
8/4/2025
Construction Start Date:
8/4/2025
Construction End Date:
8/11/2026
Work Type:
Bridge
Project Type:
Bridges
Highest Funding Level:
Local
DBE:
No
Bridge replacement
Major Items
NumberDescriptionUnitQuantity
2401.507/03643
STRUCTURAL CONCRETE (3B52)
C Y
263
2401.508/00011
REINFORCEMENT BARS (EPOXY COATED)
LB
181510
2401.518
BRIDGE SLAB CONCRETE (3YHPC-M)
S F
6999
2452.503
C-I-P CONCRETE PILING 12"
L F
960
2452.503
C-I-P CONCRETE PILING 16"
L F
960
2511.509/00015
RANDOM RIPRAP CLASS V
TON
2200
2575.504/00110
RAPID STABILIZATION METHOD 4
S Y
1456
Contract Owner
Pillatzki, Kyle
1355 9th Avenue
Windom, MN   56101
Contract Engineer
Klisch, Nick
1355 9th Ave
Windom, MN   56101