Contract Number:
002509
Projects:
SP 073-070-028
Other Projects:
Contract Description:
ROUNDABOUT @ CSAH 2 AND MN STREET
Construction Location:
INTERSECTION OF CSAH 2 AND MINNESOTA STREET ST JOSEPH
City of Township:
Waite Park

Bid Opening Date & Time:
5/22/2025, 4:00 PM
Award Date:
6/3/2025
Contract Start Date:
6/3/2025
Construction Start Date:
7/7/2025
Construction End Date:
8/29/2025
Work Type:
Aggregate, Bituminous, Concrete, Electrical, Grading, Pipe and Culvert, Traffic Control, Excavation, Traffic Marking/Striping
Project Type:
Road and Street
Highest Funding Level:
Federal
DBE:
Yes
Stearns County Highway Project Close May 22, 2025 St. Cloud, Minnesota Advertisement for Bids – STEARNS COUNTY HAS IMPLEMENTED ONLINE PROJECT BIDDING USING THE QUEST CONSTRUCTION DATA NETWORK. ONLY ELECTRONIC BIDS WILL BE ACCEPTED THROUGH WWW.QUESTCDN.COM. Sealed proposals will ONLY be received and accepted via the online electronic bid service through www.questcdn.com, until 11:00 A.M. on Thursday, May 22, 2025 for the contract listed below. Electronic bids will be opened publicly at the Stearns County Highway (Public Works) Department Building located at 455 28th Avenue South, Waite Park, MN 56387. STATE PROJECT NO.: SP 073-070-028; Minn. Proj. No. HSIP CRP 7325 (272) LOCATION: CSAH 2 from 594’ south of West Minnesota Street to 639’ north of West Minnesota Street TYPE OF WORK: Concrete paving, bituminous surfacing, grading, roundabout, storm sewer, lighting, pavement markings Bids must be accompanied by a certified check or corporate surety bond in favor of the County Auditor/Treasurer of Stearns County for at least five percent (5%) of the amount of the proposal. Bids will be considered for award of Contract at the first regular meeting of the Stearns County Board of Commissioners following the opening of bids. The County reserves the right to reject any or all bids and to waive any informalities. Dated at St. Cloud, Minnesota this 28th day of April 2025. Publish: Stearns County Web Site April 28 – May 22, 2025.
Major Items
NumberDescriptionUnitQuantity
2104.504/00120
REMOVE BITUMINOUS PAVEMENT
S Y
9482
2106.507/00010
EXCAVATION - COMMON
C Y
5847
2106.507/00130
COMMON EMBANKMENT (CV)
C Y
8060
2211.507/00210
AGGREGATE BASE (CV) CLASS 6
C Y
3062
2301.504/00070
CONCRETE PAVEMENT 7.0"
S Y
2570
2360.509/12200
TYPE SP 9.5 WEARING COURSE MIX (2,B)
TON
181
2360.509/23205
TYPE SP 12.5 NON WEAR COURSE MIX (3,B)
TON
927
2360.509/23300
TYPE SP 12.5 WEARING COURSE MIX (3,C)
TON
1327
2451.507/00250
FINE AGGREGATE BEDDING (CV)
C Y
163
2503.503/15153
15" RC PIPE SEWER CLASS III
L F
79
2503.503/15303
30" RC PIPE SEWER CLASS III
L F
79
2503.503/15363
36" RC PIPE SEWER CLASS III
L F
227
2503.503/18023
22'' SPAN RC PIPE-ARCH SEWER CL IIIA
L F
125
2503.503/18045
44'' SPAN RC PIPE-ARCH SEWER CL IIIA
L F
105
2521.518/00060
6" CONCRETE WALK
S F
7131
2531.503/02120
CONCRETE CURB & GUTTER DESIGN B424
L F
1512
2531.503/02310
CONCRETE CURB & GUTTER DESIGN B612
L F
247
2531.503/02320
CONCRETE CURB & GUTTER DESIGN B624
L F
1035
2531.503/18120
CONCRETE CURB & GUTTER DESIGN R424
L F
333
2545.501/00101
LIGHTING SYSTEM "A"
LS
1
2582.503/40104
4" SOLID LINE MULTI COMP GR IN (WR)
L F
1818
2582.503/40106
6" SOLID LINE MULTI COMP GR IN (WR)
L F
3327
2582.503/40124
24" SOLID LINE MULTI COMP GR IN (WR)
L F
94
2582.503/40306
6" DOTTED LINE MULTI COMP GR IN (WR)
L F
36
2582.503/40312
12" DOTTED LINE MULTI COMP GR IN (WR)
L F
85
2582.503/40404
4" DBLE SOLID LINE MULTI COMP GR IN (WR)
L F
2934
Contract Owner
Decker, Michael J
455 28th Avenue S
Waite Park, MN   56387
Contract Engineer
Decker, Michael J
455 28th Avenue S
Waite Park, MN   56387