Contract Number:
4015-3100
Projects:
4025-3100
Other Projects:
Contract Description:
Lift Station #10 Replacement
Construction Location:
City of St. Louis Park, MN
City of Township:
Bid Opening Date & Time:
4/24/2025, 3:00 PM
Award Date:
5/5/2025
Contract Start Date:
5/5/2025
Construction Start Date:
5/19/2025
Construction End Date:
11/21/2025
Work Type:
Water Main/Storm Sewer/Sanitary Sewer
Project Type:
Sewer and Water
Highest Funding Level:
Local
DBE:
No
Lift Station #10 Replacement in Webster Park
Number | Description | Unit | Quantity |
---|---|---|---|
0000.000 | ELECTRICAL | LS | 1 |
2104.502/01880 | REMOVE LIFT STATION | LS | 1 |
2104.504/00090 | REMOVE CONCRETE PAVEMENT | S Y | 75 |
2503.603 | 6" SANITARY FORCE MAIN DIRECTIONAL DRILLED | LF | 460 |
2504.603/01062 | 6" WATERMAIN DUCTILE IRON CL 52 | L F | 50 |
2506.503 | CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (SAN-3) | EA | 22.9 |
2506.601/00011 | CONSTRUCT LIFT STATION WET WELL & VALVE VAULT | LS | 1 |
2521.518/00060 | 6" CONCRETE WALK | S F | 200 |
2531.504/00080 | 8" CONCRETE DRIVEWAY PAVEMENT | SF | 350 |
2575.501 | TURF RESTORATION | SY | 500 |
Contract Owner
Schweiger, Sarah
5005 Minnetonka Boulevard
St. Louis Park, MN 55416
Contract Engineer