Contract Number:
2574
Projects:
SAP 066-648-006
Other Projects:
SAP 066-648-006: 48-06
Contract Description:
CSAH 48 Mill, Overlay & Turn Lane Construction
Construction Location:
CSAH 48 between Highland Pl and TH 60 location Faribault, MN
City of Township:
Bid Opening Date & Time:
4/10/2025, 3:00 PM
Award Date:
4/22/2025
Contract Start Date:
5/5/2025
Construction Start Date:
5/5/2025
Construction End Date:
10/3/2025
Work Type:
Mill and Overlay
Project Type:
Road and Street
Highest Funding Level:
State
DBE:
No
CSAH 48 between Highland Pl and TH 60 location Faribault, MN
Number | Description | Unit | Quantity |
---|---|---|---|
2106.507/00010 | EXCAVATION - COMMON | C Y | 576 |
2232.504/00060 | MILL BITUMINOUS SURFACE (2.0") | S Y | 6851 |
2232.504/00270 | MILL BITUMINOUS SURFACE (8.0") | S Y | 50646 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) | TON | 16757 |
2503.602/00042 | CONNECT TO EXISTING STORM SEWER | EACH | 2 |
2521.518/00060 | 6" CONCRETE WALK | S F | 672 |
2545.502/09040 | LIGHTING UNIT TYPE 9-40 | EACH | 2 |
2563.601/00010 | TRAFFIC CONTROL | LS | 1 |
2565.616/00101 | REVISE SIGNAL SYSTEM A | SYSTEM | 1 |
2582.503 | 6" SOLID LINE MULTI-COMPONENT GROUND IN (WR) | L F | 26089 |
2582.518 | CROSSWALK PREFORM THERMOPLASTIC GROUND IN CONTRAST ENHANCED SKID RESISTANCE | S F | 882 |
Contract Owner
Contract Engineer