Contract Number:
S.P. 163-296-007
Projects:
S.P. 163-296-007, S.P. 163-276-038, CP 4024-1100
Other Projects:
STBG 6225(161)
Contract Description:
2025 & 2026 Cedar Lake Road and Louisiana Avenue Reconstruction
Construction Location:
Cedar Lake Road and Louisiana Avenue
City of Township:
City of St. Louis Park, MN

Bid Opening Date & Time:
5/23/2025, 3:00 PM
Award Date:
6/2/2025
Contract Start Date:
6/2/2025
Construction Start Date:
6/16/2025
Construction End Date:
10/31/2026
Work Type:
Reconstruct
Project Type:
Road and Street
Highest Funding Level:
Federal
DBE:
Yes
2025 & 2026 Cedar Lake Road and Louisiana Ave Reconstruction
Major Items
NumberDescriptionUnitQuantity
2101.502/00030
GRUBBING
EACH
37
2104.503/00315
REMOVE CURB AND GUTTER
L F
18847
2104.504/00120
REMOVE BITUMINOUS PAVEMENT
S Y
38100
2105.607/00015
COMMON EXCAVATION
C Y
16991
2211.507/00170
AGGREGATE BASE (CV) CLASS 5
C Y
17700
2360.509/13300
TYPE SP 9.5 WEARING COURSE MIXTURE (3,C)
TON
3375
2360.509/23205
TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B)
TON
4925
2360.509/23300
TYPE SP 12.5 WEARING COURSE MIXTURE (3,C)
TON
3335
2401.507/03143
STRUCTURAL CONCRETE (3G52)
C Y
97
2503.503/19155
15" RC PIPE SEWER DESIGN 3006 CLASS V
L F
2231
2504.603/01122
12" WATERMAIN DUCTILE IRON CL 52
L F
5102
2506.503/00300
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
L F
161.7
2506.503/02420
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
L F
145.3
2521.518/00040
4" CONCRETE WALK
S F
45300
2521.518/00060
6" CONCRETE WALK
S F
15325
2521.518/00063
6" CONCRETE WALK SPECIAL
S F
22600
2531.503/02315
CONCRETE CURB AND GUTTER DESIGN B618
L F
11305
2565.616/00060
PEDESTRIAN CROSSWALK FLASHER SYSTEM
SYS
9
2565.616/00100
REVISE SIGNAL SYSTEM
SYS
1
Contract Owner
Wiesen, Aaron
5005 Minnetonka Boulevard
St. Louis Park, MN   55416
Contract Engineer
Kyle Imholte
11995 Singletree Lane
Suite 225
Eden Prairie, MN   55344