Contract Number:
17-12
Projects:
17-12, 20-04
Other Projects:
SAP 108-131-002, 108-132-003
Contract Description:
Wright-10th Reconstruction Project
Construction Location:
Wright Street - South 6th Street to 13th Street SE (CR 45), 10th Street SE - Industrial Park Road (CR 117) to Wright Street
City of Township:
Brainerd, MN
Bid Opening Date & Time:
5/1/2025, 3:00 PM
Award Date:
5/5/2025
Contract Start Date:
5/12/2025
Construction Start Date:
5/12/2025
Construction End Date:
10/3/2025
Work Type:
Bituminous, Grading, Reconstruct, Water Main/Storm Sewer/Sanitary Sewer
Project Type:
Road and Street
Highest Funding Level:
State
DBE:
No
The City of Brainerd (Owner) is requesting Bids for the construction of the following Projects:
Imp. 17-12 – Wright/10th Reconstruction Project (SAP 108-131-002 and SAP 108-132-003)
Bids for the construction of the Projects will be received at the Office of the City Engineer located at City of Brainerd, 501 Laurel Street, Brainerd, MN 56401, until Thursday, May 1st, 2025 at 10:00 a.m. local time. At that time the Bids received will be publicly opened and read.
The Project includes the following Work:
Grading, Aggregate Base, Bituminous Surfacing, Storm Sewer, Watermain, and Concrete Curb & Gutter. Please note the updated special provisions.
Number | Description | Unit | Quantity |
---|---|---|---|
2105.607 | COMMON EXCAVATION | C Y | 10055 |
2211.509/00070 | AGGREGATE BASE CLASS 5 | TON | 13034 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) | TON | 5664 |
2504.603/02012 | 12" PVC WATERMAIN | L F | 1994 |
2504.603/02016 | 16" PVC WATERMAIN | L F | 2982 |
2506.502 | CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 | EACH | 24 |
2531.503 | CONCRETE CURB AND GUTTER DESIGN B624 | L F | 10081 |
Contract Owner
Jessie Dehn, P.E., City Engineer
501 Laurel Street
Brainerd, MN 56401
Contract Engineer
Jessie Dehn, P.E., City Engineer
501 Laurel Street
Brainerd, MN 56401