Contract Number:
2023-09R
Projects:
2023-09R
Other Projects:
Contract Description:
Straight River Watermain Crossing Rebid
Construction Location:
2nd Avenue NE, Faribault MN 55021
City of Township:
Faribault

Bid Opening Date & Time:
3/19/2025, 4:00 PM
Award Date:
3/25/2025
Contract Start Date:
5/1/2025
Construction Start Date:
5/1/2025
Construction End Date:
9/12/2025
Work Type:
Water Main/Storm Sewer/Sanitary Sewer
Project Type:
Sewer and Water
Highest Funding Level:
Local
DBE:
No
20" Watermain Replacement
Major Items
NumberDescriptionUnitQuantity
2104.502/02920
SALVAGE LIGHTING UNIT
EACH
5
2360.509/23200
TYPE SP 12.5 WEARING COURSE MIX (3,B)
TON
175
2360.509/23305
TYPE SP 12.5 NON WEAR COURSE MIX (3,C)
TON
90
2504.601/00013
CATHODIC PROTECTION SYSTEM
LS
1
2504.601/01921
20" WATERMAIN HDPE (DIRECTIONAL DRILLED)
L S
1
2504.602/00820
20" GATE VALVE & BOX
EACH
1
2504.608/00020
DUCTILE IRON FITTINGS
LB
2385
2521.518/00040
4" CONCRETE WALK
S F
300
2521.518/00060
6" CONCRETE WALK
S F
500
2521.518/00140
4" BITUMINOUS WALK
S F
1100
2531.503/02315
CONCRETE CURB & GUTTER DESIGN B618
L F
410
Contract Owner
Duchene, Mark W
208 1st Avenue NW
Faribault, MN   55021
Contract Engineer
Duchene, Mark W
208 1st Avenue NW
Faribault, MN   55021