Contract Number:
2023-09R
Projects:
2023-09R
Other Projects:
Contract Description:
Straight River Watermain Crossing Rebid
Construction Location:
2nd Avenue NE, Faribault MN 55021
City of Township:
Faribault
Bid Opening Date & Time:
3/19/2025, 4:00 PM
Award Date:
3/25/2025
Contract Start Date:
5/1/2025
Construction Start Date:
5/1/2025
Construction End Date:
9/12/2025
Work Type:
Water Main/Storm Sewer/Sanitary Sewer
Project Type:
Sewer and Water
Highest Funding Level:
Local
DBE:
No
20" Watermain Replacement
Number | Description | Unit | Quantity |
---|---|---|---|
2104.502/02920 | SALVAGE LIGHTING UNIT | EACH | 5 |
2360.509/23200 | TYPE SP 12.5 WEARING COURSE MIX (3,B) | TON | 175 |
2360.509/23305 | TYPE SP 12.5 NON WEAR COURSE MIX (3,C) | TON | 90 |
2504.601/00013 | CATHODIC PROTECTION SYSTEM | LS | 1 |
2504.601/01921 | 20" WATERMAIN HDPE (DIRECTIONAL DRILLED) | L S | 1 |
2504.602/00820 | 20" GATE VALVE & BOX | EACH | 1 |
2504.608/00020 | DUCTILE IRON FITTINGS | LB | 2385 |
2521.518/00040 | 4" CONCRETE WALK | S F | 300 |
2521.518/00060 | 6" CONCRETE WALK | S F | 500 |
2521.518/00140 | 4" BITUMINOUS WALK | S F | 1100 |
2531.503/02315 | CONCRETE CURB & GUTTER DESIGN B618 | L F | 410 |
Contract Owner
Contract Engineer