City street reconstruction including: Milling bituminous, bituminous pavement, Concrete Base, Concrete Walk, Concrete Curb and Gutter, Water main, Lighting.
Construction Location:
East 23rd Street
City of Township:
Hibbing, MN
Bid Opening Date & Time:
3/12/2025, 3:00 PM
Award Date:
5/12/2025
Contract Start Date:
5/1/2025
Construction Start Date:
5/12/2025
Construction End Date:
8/29/2025
Work Type:
Bituminous, Concrete, Mill and Overlay, Reconstruct, Water Main/Storm Sewer/Sanitary Sewer
Project Type:
Road and Street
Highest Funding Level:
State
DBE:
No
City of Hibbing Engineering Current Projects
Number | Description | Unit | Quantity |
---|---|---|---|
2232.504 | Milling Bituminous Pavement | Sq. Yd. | 14704 |
2301.604 | Concrete Pavement | Sq. Yd. | 3885 |
2360.509 | Type SP 9.5 Bituminous Wear Mixture | Ton | 2350 |
2504.603 | 8" PVC Watermain | Lin. Ft. | 571 |
2504.603 | 8" Watermain (Trenchless) | Lin. Ft. | 1411 |
2521.518 | 4" concrete Walk | Sq. Ft. | 22075 |
2521.518 | 6" concrete walk - reinforced | Sq. Ft. | 6275 |
2531.503 | Concrete Curb and Gutter Design B | Lin. Ft. | 5429 |
2545.501 | Lighting System | LS | 1 |
Contract Owner