Contract Number:
4025-1000
Projects:
4025-1000
Other Projects:
Contract Description:
2025 Pavement Management Project
Construction Location:
St. Louis Park, MN
City of Township:
St. Louis Park, MN

Bid Opening Date & Time:
3/11/2025, 3:00 PM
Award Date:
4/7/2025
Contract Start Date:
4/7/2025
Construction Start Date:
5/1/2025
Construction End Date:
9/30/2025
Work Type:
Reconstruct
Project Type:
Road and Street
Highest Funding Level:
Local
DBE:
No
2025 Pavement Management Project (4025-1000)
Major Items
NumberDescriptionUnitQuantity
2232.504/00020
MILL BITUMINOUS SURFACE (1.0")
S Y
32000
2232.504/00260
MILL BITUMINOUS SURFACE (7.5")
S Y
42000
2232.504/00270
MILL BITUMINOUS SURFACE (8.0")
S Y
6000
2232.504/00310
MILL BITUMINOUS SURFACE (10.0")
S Y
1000
2360.509/12300
TYPE SP 9.5 WEARING COURSE MIXTURE (2,C)
TON
8750
2360.509/22305
TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C)
TON
6000
2503.503/13100
10" PVC PIPE SEWER
L F
265
2503.503/19125
12" RC PIPE SEWER DESIGN 3006 CLASS V
L F
194
2503.603/36040
4" HDPE PIPE SEWER
L F
390
2506.503/00060
CONSTRUCT DRAINAGE STRUCTURE DESIGN F
L F
25
2506.503/00300
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
L F
14
2506.503/02420
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
L F
30.1
2521.518/00040
4" CONCRETE WALK
S F
880
2521.618/00201
CONCRETE WALK
S F
167
2531.503/02315
CONCRETE CURB AND GUTTER DESIGN B618
L F
5200
2531.504/00060
6" CONCRETE DRIVEWAY PAVEMENT
S Y
255
2575.504/00011
SODDING TYPE LAWN
S Y
600
Contract Owner
Wiesen, Aaron
5005 Minnetonka Boulevard
St. Louis Park, MN   55416
Contract Engineer
Wiesen, Aaron
5005 Minnetonka Boulevard
St. Louis Park, MN   55416