Contract Number:
25-01
Projects:
25-01
Other Projects:
Contract Description:
2025 Miscellaneous Improvements Project
Construction Location:
City of Lakeville
City of Township:

Bid Opening Date & Time:
2/27/2025, 4:30 PM
Award Date:
3/17/2025
Contract Start Date:
3/18/2025
Construction Start Date:
4/7/2025
Construction End Date:
6/20/2026
Work Type:
Bituminous, Concrete, Mill and Overlay, Pipe and Culvert, Traffic Control, Water Main/Storm Sewer/Sanitary Sewer, Excavation, Traffic Marking/Striping, Trail Construction
Project Type:
Road and Street
Highest Funding Level:
Local
DBE:
No
The majority of the work includes bituminous surface milling, bituminous paving, concrete curb and gutter replacement, concrete sidewalk and ADA ramp replacement, storm basin maintenance, pervious paver and bituminous parking lot rehabilitations with associated striping, bituminous trail rehabilitation, and minor storm sewer installations.
Major Items
NumberDescriptionUnitQuantity
2104.503
REMOVE CURB & GUTTER
LF
3429
2104.518
REMOVE CONCRETE WALK
SF
3892
2106.607
EXCAVATION - CHANNEL AND POND (LV)
CY
4280
2106.607
EXCAVATION - CHANNEL AND POND (LV) (SPECIAL)
CY
2170
2215.504
FULL DEPTH RECLAMATION
SY
14128
2232.504
MILL BITUMINOUS SURFACE (2.0")
SY
39015
2360.509/13200
TYPE SP 9.5 WEARING COURSE MIX (3,B)
TON
4785
2503.503
12" PVC PIPE SEWER
LF
164
2503.503
15" RC PIPE SEWER DES 3006 CL V
LF
49
2503.503
65" SPAN RC PIPE-ARCH SEWER CL IIA
LF
16
2531.503
CONCRETE CURB & GUTTER DESIGN B618
LF
1303
2531.503
CONCRETE CURB & GUTTER DESIGN D412
LF
1922
2540.618
INSTALL BRICK PAVERS
SF
5776
2582.503
4" SOLID LINE PAINT
LF
1642
Contract Owner
Ferraro, Steve
20195 Holyoke Ave
Lakeville, MN   55044
Contract Engineer
Ferraro, Steve
20195 Holyoke Ave
Lakeville, MN   55044