Contract Number:
25-02
Projects:
25-02
Other Projects:
Contract Description:
2025 Street Reconstruction/Rehabilitation Project
Construction Location:
City of Township:

Bid Opening Date & Time:
3/4/2025, 4:30 PM
Award Date:
4/7/2025
Contract Start Date:
4/8/2025
Construction Start Date:
4/8/2025
Construction End Date:
10/10/2025
Work Type:
Aggregate, Bituminous, Mill and Overlay, Pipe and Culvert, Reconstruct, Traffic Control, Water Main/Storm Sewer/Sanitary Sewer, Traffic Marking/Striping
Project Type:
Road and Street
Highest Funding Level:
Local
DBE:
No
Reconstruction and rehabilitation of city streets including full depth reclamation, variable depth milling and bituminous underseal. Watermain lining and storm sewer structure installations with associated pipe work. Select concrete curb & gutter, sidewalk removals and replacement.
Major Items
NumberDescriptionUnitQuantity
2104.503
REMOVE CURB & GUTTER
LF
10187
2104.518
REMOVE CONCRETE WALK
SF
34807
2215.504
FULL DEPTH RECLAMATION
SY
31442
2232.504
MILL BITUMINOUS SURFACE (VARIABLE DEPTH)
SY
47233
2360.509/13200
TYPE SP 9.5 WEARING COURSE MIX (3,B)
TON
4404
2360.509/13300
TYPE SP 9.5 WEARING COURSE MIX (3,C)
TON
3690
2360.509/23305
TYPE SP 12.5 NON WEAR COURSE MIX (3,C)
TON
4664
2503.503
15" RC PIPE SEWER CLASS V
LF
211
2504.603
LINING WATER MAIN 12"
LF
3550
2504.608/00020
DUCTILE IRON FITTINGS
LB
3159
2506.503
CONST DRAINAGE STRUCTURE DES 48-4020
LF
45
2582.503
4" DBLE SOLID LINE PAINT
LF
10416
Contract Owner
Ferraro, Steve
20195 Holyoke Ave
Lakeville, MN   55044
Contract Engineer
Ferraro, Steve
20195 Holyoke Ave
Lakeville, MN   55044