Contract Number:
SAP 016-599-005
Projects:
016-599-005
Other Projects:
Contract Description:
BRIDGE 16532 OVER SPRUCE CREEK
Construction Location:
3.0 MILES NORTHEAST OF JCT. TH 61 ON CASCADE BEACH ROAD OVER SPRUCE CREEK, 11.5 MILES SOUTHWEST OF GRAND MARAIS, MN.
City of Township:
Bid Opening Date & Time:
1/28/2025, 8:00 PM
Award Date:
2/4/2025
Contract Start Date:
6/1/2025
Construction Start Date:
6/1/2025
Construction End Date:
8/31/2025
Work Type:
Bridge
Project Type:
Bridges
Highest Funding Level:
State
DBE:
No
REMOVAL OF EXISITING BRIDGE L4130, CONSTRUCT BRIDGE 16532 AND APPROACHES AND GRADING OVER SPRUCE CREEK
Number | Description | Unit | Quantity |
---|---|---|---|
2211.507 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 543 |
2401.507 | STRUCTURAL CONCRETE (1G52) | CU YD | 53 |
2401.507 | STRUCTURAL CONCRETE (3B52) | CU YD | 58 |
2401.508 | REINFORCEMENT BARS | POUND | 3880 |
2401.508 | REINFORCEMENT BARS (EPOXY COATED) | POUND | 22870 |
2401.518 | BRIDGE SLAB CONCRETE (3YHPC-M) | SQ FT | 980 |
2402.508 | STRUCTURAL STEEL (3306) | POUND | 750 |
2403.603/00020 | TIMBER RAILING | LIN FT | 66 |
2403.622/00020 | TREATED TIMBER | MBM | 0.938 |
2442.501/00010 | REMOVE EXISTING BRIDGE | LUMP SUM | 1 |